British Columbia Solar – Simple Net Metering
British Columbia Solar Simple Net Metering is available by submitting an application to see if your project meets the requirements.
Application process (we can also file!!)
You can access program documents, including application forms at bchydro.com/netmetering.
British Columbia Solar Net Metering Steps:
1. SUBMIT AN APPLICATION
Submit a completed Simple Net Metering Interconnection Application Form to net.metering@bchydro.com. It’ll take us up to 2 weeks to review your application and assess your connection to the grid.
2. INSTALL YOUR SYSTEM
Once your application is accepted, your contractor can move forward with installing your system.
3. INSPECT YOUR SYSTEM
Submit your electrical contractor’s Authorization & Declaration of Compliance or Certificate of Electrical Inspection from a BC Safety Authority Officer.
4. CONNECT TO THE GRID
We’ll authorize your connection to the grid.
This is usually two weeks after receiving the electrical inspection.
5. START SAVING
Your next bill will reflect your BC Hydro electricity usage reduced by your electricity generation and by any excess generation we credited you if you generated more electricity than you needed.
For more info: info@stardustsolar.com